A sourcing checklist for shortage parts

Ten questions to ask before you place an order for a part that is hard to find.

Integrated circuits and small components on a white circuit board

When a part is hard to find, the pressure is to buy the first lot that turns up. These ten questions take a few minutes and save most of the expensive mistakes.

  1. Is the manufacturer part number exact, including the suffix for package, temperature grade and packaging?
  2. Is there a qualified alternate you could use instead, and has engineering approved it?
  3. Where does this lot come from, and can the supplier show traceability to the original manufacturer?
  4. What is the date code, and does it meet your requirements for age and storage?
  5. Is the part moisture-sensitive, and has it been stored and packed accordingly?
  6. What inspection and testing will be done before the parts ship, and what will you do on arrival?
  7. What happens if the parts fail inspection: return, replacement or refund, and within what time?
  8. Is the quantity enough for the build, including yield and spares, or will you be back in a few weeks?
  9. How is payment protected until the parts are accepted?
  10. Does this purchase solve the problem, or should the shortage trigger a design change?

If the answer to any of these is unclear, slow down before you pay. A late part costs time; a wrong part costs the build.

Sourcing a shortage part right now? Talk to a sourcing expert.

About the author

Nishant1BUY.AI

Writes about component sourcing and procurement at 1BUY.AI.

All posts

Get started

Send us a BOM. We'll show you what you're overpaying.

The proof of concept is free and our team runs it. Findings in two weeks, a decision by week four — your own parts, real numbers, and no obligation at the end of it.

Free proof of concept15–20% cost reduction on your electronics BOM